Project based work performance looks good. Moreover, cooperates needs a productive, full time participants. Exceptions don't include for all the departments.
If to save cost, I would rather hire project-based talent but in this case, I should carefully choose the one, because some are liable, some need more control. Some task control measures should be used.
TransferChain